Woorim Foreshore Community DayOur celebration of World Wetlands Day was quite WET and you may have decided not to attend because of the weather.
HERE IS YOUR CHANCE TO CELEBRATE AGAIN.
Friday 9th March at 8am
BIEPA members are invited to join the Rotary Club of Bribie Island and Conservation Volunteers of Australia (formerly WetlandCare Australia http://www.wetlandcare.com.au.) to enjoy a day of caring for the sensitive dune system and riparian habitat along the Woorim foreshore.
You will be planting endemic plants alongside other caring community members to ensure a healthy habitat for our endangered loggerhead turtles, migratory shorebirds and other resident birds and wildlife that call our coastal dunes home.
MORNING TEA AND LUNCH WILL BE PROVIDED.
See attached Woorim Foreshore Community Day for more information.
We look forward to seeing you there.
 
From your BIEPA Management Committee.
Boronia falcifolia

BIEPA’s Wonders of the Wallum Spring Wildflower We will be meeting at the National Park entrance on the Corner of Cotterill Ave and Protea Drive.

SUNDAY 3rd September 2017 – 8:00am to 11:00am

We look forward to seeing you there for another morning of appreciation for our wonderful Wallum wildflowers.
 
From BIEPA Management Committee and organisers of the Walk.
 
DOWNLOAD the BIEPA WFW POSTER 2017
 
 

Wonderful Wallum!

Some 70 participants joined BIEPA’s annual “Wonders of the Wallum” Wildflower Walk on Sunday 28 August, through bushland off Hornsby Road, Bellara. This event is part of the Wildflower Festival organised by the Sunshine Coast Council.
The weather was perfect, many of the flower species were at their best, and the groups of walkers appreciated the knowledge and experience of our Guides – Allan Carr from Native Plants Queensland and John Ward from the Bribie Wallum Action Group and Community Nursery.

Also present on the Walk was Michael Strong, Director of Turnstone Archaeology, who responded to questions about the Aboriginal history of the area. BIEPA would like to thank them all for their valued contribution to the success of this event.
We hope all participants had an enjoyable and interesting morning. We look forward to welcoming you again next year!

 

 

Norfolk Lagoon

The story of the Bribie Borefields goes back almost two decades…….
For ten years before the State Government put out an urgent request for water (2007) at what was to become the break in a ten year drought in South East Queensland, some water engineers in the Caboolture Shire Council (CSC) had been proposing that the Bribie Island aquifers were a source of water that could supply the mainland. However, in their wisdom, the State Government’s Environmental Protection Agency (EPA) had recognized that this proposal was not viable, (environmentally and economically), understanding the unique and fragile ecosystems that maintain Bribie Island’s vegetation and wildlife. For ten years the EPA said “no” to the idea.
Then came the call for anyone who might be able to supply water to top up for dangerously low dams. This was the opportunity for the CSC to jump in the deep end unprepared, touting that they could build the Bribie Borefields for $10 million and supply 10ML/day from Bribie’s aquifers.
The Green Tape was untied and the project was fast tracked without the normal pre-requisites of an Environmental Impact Assessment; baseline studies of surrounding ecosystems; appropriate monitoring sites identified; the economics of the project and without a myriad of other assessments that would normally precede such a project.
BIEPA’s then President, Ian Bell, with his professional expertise in water management and the natural environment, recognized the folly of this proposal, especially the potential for negative impacts on Ramsar protected wetlands. In December 2007, Ian made a presentation to the CSC’s Mayor, Acting CEO, two councillors, engineers and private consultants hired for the project. Ian pointed out the deficiencies in the consultants’ and engineers’ hasty assessments of the location for the borefields, especially the consultants’ inaccurate report that the adjacent lagoons were saline. Ian showed proof that these lagoons were freshwater and the surrounding vegetation and wildlife depended on them. He warned that if the bores were to draw down too far and allow seawater intrusion, all these ecosystems on Bribie Island would be lost as well as compromise the supply of fresh water to the Project.
The CSC persisted with the Bribie Borefields Project and within six months the cost estimates blew out to more than $50 million. Ian took the issue to the Commonwealth, who limited the extraction to 4.3 ML/day & added mandatory monitoring sites to be in place. A Community Reference Group (CRG) was also established as part of the Commonwealth’s conditions for approval, because of the potential impact on adjacent Ramsar protected wetlands. www.ramsar.org/ The CRG monitors and provides regular community input on the Bribie Borefields.
BIEPA and the CRG remained resolute in their demand for transparency and accountability. Eventually the State Govt took over the Bribie Borefields Project as part of their responsibility for the supply of all bulk water. The Project came under the management of Seqwater who were able to ease the community’s concerns with the management of the Project.
The Bribie Borefields have experienced many design defects and have never reached capacity production and have never exported water to the mainland.
Even at the reduced production level, many of the producing bores hit their trigger levels during the dry period at the end of 2013 and had to be shut down. It has been estimated that the Bribie Borefields cost ratepayers in the order of $70 million – some of the most expensive water produced in Australia (more expensive than the Tugun desalination plant).
A recent review of the Bribie Borefields determined that they should be shut down indefinitely.
Sadly, Ian Bell and BIEPA were vilified by some council staff and members of the community for their stance on the long-term viability of the Bribie Borefields Project. Their stance, tenacity, expertise and wisdom has proven to be correct. And, those decision makers in council responsible for this white elephant have moved on and can not be held accountable.
As part of the Project, a pipeline, costing approximately $1 million, was constructed from the Woorim Sewage Treatment Plant to Pacific Harbour in order to supply grey water. This pipeline has never been used.