2008

Reduction of water extraction from the proposed Banksia Beach borefields

BIEPA lobbying of Commonwealth was successful in influencing the reduction of water extraction from the proposed Banksia Beach borefields on Bribie from 10ml/day to 4ml/day.

In 2014  the Banksia Beach borefields were mothballed.  It is estimated that this ill-fated project cost $70 million.

About Author

Connect with Me: